top of page
ex-3d - red.png

COURSINGTON REDEVELOPMENT 
COMMUNITY CONSULTATION 

North Lanarkshire Council New Supply, is proposing the redevelopment of the former Coursington, Allan and Draffen Tower site to deliver approximately 64 new affordable homes for NLC social rent. This proposal forms part of a broader regeneration initiative aimed at providing high-quality town centre housing and reinforcing Motherwell as a vibrant place to live.

 

Motherwell’s development is closely linked to Scotland’s Industrial history. During the 19th century, the town expanded rapidly as a centre for iron, steel, and manufacturing, supported by strong rail connections and access to raw materials. By the mid-20th century, this industrial growth significantly influenced the town’s urban form and housing provision.

 

Draffen Tower was completed in 1969, with Allan and Coursington Towers following in 1970. Each tower stood approximately 58 metres tall and contained 117 flats. These buildings, built towards the end of the post war housing boom, provided high density housing to address the need to quickly modernise and improve Britain’s housing standards. However, as housing standards continued to evolve and attitudes towards high-rise living changed, the towers became increasingly challenging to maintain. Their demolition forms
part of North Lanarkshire Council’s 25-year strategy to remove all 48 high-rise blocks across the authority area and replace them with around 6,000 new homes.

 

The proposed development will include a mix of new houses and flats, providing 2 and 3-bedroom homes and 1, 2 and 3-bedroom apartments. All homes will be designed to the Housing for Varying Needs standard and will be well-insulated, energy-efficient, and incorporate zero direct heating emissions systems in line with the Sustainable Homes Local Housing Strategy.

THE SITE AND THE CONTEXT 

Location Plan w numbers.png

Arial view of site post demolition

Coursington Community Consultation REVF_page-0001.jpg

Ariel view of site post demolition

Looking north-west from Coursington Road

Coursington Community Consultation REVF_page-0001.jpg

Looking south-east from Merry Street

Looking south from Merry Street

SITE ANALYSIS

Site Analysis - Building Use Map.png

Building Use Map:
The site, near the town centre, is a key transition point between low-rise residential areas to the north and east and the commercial centre to the west. The proposal includes higher-density flats at the junction of Merry Street and Wilson Street, creating a distinct urban edge. This transitions to a mixture of two and one-storey family housing along Allan Street.

Site Analysis - Active Travel Plan.png

Transport Map:

Situated close to the town centre, the site is well connected to Local Transport infrastructure.
• 10 minute walk to Motherwell town centre shopping areas.
• 10 minute walk to Motherwell Train Station.
• Adjacent to local bus routes with bus stops located on Merry Street.

NLC.png
CEA - New Logo (Medium).JPG

© 2021 by Coltart Earley Architecture 

bottom of page